Offplan

Cove

GradientLine
  • AED 580,122
    Starting Price
  • Studios, 1 - 2 BR Apartments
    Available units
  • 450
    Area from (sq.ft)
  • 2027
    Handover

About Cove

Rising amidst the vibrant Dubailand district, Cove by Imtiaz promises an unparalleled living experience. This stunning development by Imtiaz boasts 32 floors of meticulously designed residences, poised to become the crown jewel of the neighborhood.

Cove caters to both discerning investors and those seeking an exceptional lifestyle. Attractive pricing plans and a flexible payment structure make it an enticing opportunity to be part of a rapidly developing area. Residents will enjoy effortless access to Dubai's iconic landmarks, with the Dubai Mall reachable within 18 minutes and the Lycée Français de Dubai just a short 10-minute drive away.

Beyond its prime location, Cove offers a haven of luxurious amenities spread across three distinct levels. Residents can indulge in a plethora of swimming pools, unwind in dedicated relaxation areas, or stay productive in co-working spaces. Families will appreciate the thoughtfully designed children's play areas, while a private cinema adds a touch of sophistication. Every detail is meticulously considered, from fully furnished and equipped apartments finished to the highest standards to the integration of smart home technology and top-of-the-line Bosch appliances.

Whether you seek the efficiency of a studio apartment or the spacious comfort of a two-bedroom residence, Cove caters to diverse needs. Generously sized units, ranging from 37sqm studios to expansive 100sqm+ two-bedroom apartments, ensure ample living space. Most remarkably, 90% of units boast private Jacuzzis on their balconies, offering breathtaking, unobstructed views and the ultimate indulgence in luxury living.

Our-story-bg

Property Information

  • Location
    Dubailand, Dubai, UAE
  • Developer
    Imtiaz
  • Status of Project
    Offplan
  • Area from
    450 sq.ft
  • Type of Project
    Apartment

Payment plan Option 1: 60/40 , Option 2: 3 Years Post Handover

  • 20%

    Booking
  • 40%

    Construction
  • Option 1: 40% and Option 2: 10% with 30% post handover

    Handover
GradientLine

Connect With Us Now

Language
Loading...